What is more affordable, onsite or offsite steel building construction?
Jul 18, 2024
2 min read
0
13
0

When it comes to steel building construction, there are two primary methods: onsite construction from scratch and offsite pre-engineered metal buildings. Pre-engineered buildings have become popular due to their affordability and faster construction times. This article explores the process of pre-engineered metal building construction and explains why it is often the more affordable option.
The Process of Pre-Engineered Metal Building Construction
Client Expectation Meeting
The process begins with a meeting between the client and the construction company. During this meeting, the client's needs and expectations are discussed in detail, including the building's purpose, size, design preferences, budget, and timeline.
Joint Collaboration of All Contractors
Once the initial meeting is complete, the next step involves collaboration among all contractors involved in the project, including architects, engineers, and construction managers. Joint collaboration ensures that everyone is on the same page and that the project proceeds without any misunderstandings.
Design Phase
Architects and designers create detailed plans and blueprints based on the client's specifications. This phase involves using advanced software and performing structural analysis to ensure the building will be safe and durable.
Engineering the Parts
After the design is finalized and approved by the client, the engineering phase begins. In this stage, the individual components of the building are manufactured in a factory. These components are precisely engineered to fit together perfectly without any errors.
Transportation and Installation
Once the parts are manufactured, they are transported to the construction site. The pre-engineered components are then assembled onsite, a process that is much faster than traditional construction methods.
Why Pre-Engineered Steel Buildings Are More Affordable?
No Chance of Mistakes
One of the advantages of pre-engineered metal buildings is the minimal mistakes. Since the parts are manufactured in a controlled factory environment, there is less room for human error. The precise engineering and manufacturing processes ensure that each component meets the exact specifications for a smoother construction process.
Minimum Wastage During Construction
Pre-engineered buildings result in minimal waste. In traditional construction, material can be wasted due to onsite cutting and fitting. However, with pre-engineered buildings, the parts are manufactured to the exact dimensions to reduce material wastage.
Low Labor Cost for Installation
The assembly of pre-engineered metal buildings is quick compared to traditional construction methods. Less construction time means lower labor costs. Additionally, fewer specialized skills are required for assembly. This means only a few workers are required to assemble a pre-engineered metal building over the course of a few days.
Â
Conclusion
Pre-engineered steel buildings offer a cost-effective and efficient alternative to traditional onsite construction methods. Steel offices, warehouses, factories, shops, and storage halls have been an affordable choice for many property owners in Omaha.
Lacey Construction Inc. provides high-quality steel construction services for residential, industrial, and commercial buildings. They can work on any scale of project, from large to small. As a local contractor, they are reliable and responsible. Reach out to get a quote from them now!
Also explore on Google for their customer reviews Lacey Construction Inc.!
Read Also: Is steel building construction right for a sporting facility?